SEQNCS
SCHEDULE INTELLIGENCE FOR PRIMAVERA P6

Turn complex schedules into decisions.

Analyze XER files, compare revisions, build executive-ready reports and create construction lookaheads — in one focused project-controls workspace.

FREE toolsNo account requiredXER schedule data stays in your browser
SEQNCSDEMO READY
CURRENT SCHEDULE

Metro Level 4 — Update 01

2,837Activities
3,084Relationships
168WBS nodes
One schedule. Check, explore, report and plan ahead.
Built for plannersProject ControlsProject ManagersConstruction teamsConsultants
ONE WORKSPACE

From schedule health to site execution.

SEQNCS keeps the workflow close to the schedule: evidence first, low friction, no generic BI layer in between.

FREE

Schedule Check

Run the complete DCMA 14-point assessment and inspect the activities behind every result.

FREE

Schedule Explorer

View an XER as a structured Gantt or compare two revisions for additions, removals, milestone movement and logic changes.

PRO

Schedule Reporting

Turn schedule data into professional PDF, editable Excel evidence packs and PowerPoint reporting.

PRO

Lookahead

Build a construction-focused 3-week lookahead, edit activities and manpower, then issue PDF and editable Excel outputs.

THREE STEPS

Open. Understand. Deliver.

01

Open the XER

Load a Primavera P6 schedule once. SEQNCS normalizes it locally and reuses it across the workspace.

02

Interrogate the plan

Check schedule quality, inspect the Gantt, compare revisions and focus on the changes that matter.

03

Create the deliverable

Move from evidence to executive reporting and short-term execution planning without rebuilding the schedule elsewhere.

PRIVACY BY ARCHITECTURE

Your schedule stays your schedule.

XER parsing and schedule analysis run in the browser. SEQNCS telemetry is deliberately limited to product usage and technical diagnostics — not project names, activity names, WBS values or XER content.

START FREE

Use the core tools now. Join PRO while we shape what comes next.

FREE

€0 forever

For immediate schedule checking and exploration.

  • Complete DCMA Schedule Check
  • Schedule Explorer VIEW + COMPARE
  • FREE PDF outputs with SEQNCS branding
  • No card required
PRO

€39 / month

FOUNDING · FIRST 30

30 days of full PRO free for the first 30 qualified users, in exchange for structured product feedback.

  • Professional PDF + Excel + PowerPoint reporting
  • Construction Lookahead + PDF/Excel outputs
  • Custom branding / white-label outputs
  • No card and no automatic renewal during Early Access
FOUNDING EARLY ACCESS

Help shape the project-controls workspace you would actually use.

First 30 qualified users. 30 days of full SEQNCS PRO. No card. No automatic renewal.

DashboardNo schedule loaded

Your schedule workspace

Load once. Use the same normalized schedule across SEQNCS.

FOUNDING EARLY ACCESS · FIRST 3030 days of full SEQNCS PRO. Free.

No card required. No automatic renewal. Commercial PRO price: €39/month.

Open a Primavera P6 XER

Upload once and use the same schedule across Schedule Check and Schedule Explorer.

or drop a file here
Synthetic infrastructure schedule · Level 4 · 2,793 activities · no upload required
No account or module-specific upload required.

Waiting for schedule

Once loaded, the same Current Schedule will be visible in Check, Explorer, Reporting and Lookahead.

—Activities
—Relationships
—WBS nodes
—Resources

Schedule Check

Run the complete DCMA 14-point schedule check with full offender evidence.

Open Check →

Schedule Explorer

Unified product with two distinct modes: VIEW and COMPARE.

Open Explorer →

Schedule Reporting

Professional reporting workspace available with SEQNCS PRO.

Preview Reporting →

Lookahead

Execution-focused planning workspace available with SEQNCS PRO.

Preview Lookahead →

Start free. Upgrade when the schedule becomes a deliverable.

€0 forever

No card and no artificial usage limit.

✓ Complete DCMA check + offenders
✓ Schedule Explorer VIEW + COMPARE
✓ FREE PDF outputs with SEQNCS branding

€39 / month

Commercial price after Early Access
FIRST 30

Founding Early Access: 30 days of full PRO at no cost, in exchange for structured product feedback.

✓ PDF + Excel + PowerPoint Schedule Reporting
✓ Lookahead workspace + PDF/Excel
✓ No branding or custom branding
✓ No card · no automatic renewal

Schedule Check FREE

Complete DCMA 14-point schedule assessment with full offender evidence.

Schedule Explorer FREE

One product, two clear modes. VIEW and COMPARE share the same schedule state.

No schedule loaded

Open a Primavera P6 XER once. The shared Current Schedule will appear here without reparsing the XER.

Schedule Reporting PRO

Configure professional project-controls deliverables from the shared Current Schedule.

No schedule loaded

Report modelNo schedule

Executive schedule report

Portrait, management-ready report using the selected chapters and branding.

M4.3h: generation is active for Chapters 01–09. Methodology & Appendix documents calculation rules, assumptions, source coverage and data warnings.

Live preview · PDF page style
SEQNCS · SCHEDULE INTELLIGENCE
Schedule Report
Project schedule
—Total Activities
14DCMA Tests
—Completion Drivers
—Reliability
03 · Schedule QualityExecutive summary
Missing logic
High float
Long durations
Constraints
Invalid dates
Resources

Management Roadmap Builder

Select any activity or milestone from the Current Schedule. Dragging changes the configuration order; the PDF is always ordered chronologically by Forecast Finish / Finish.

Schedule activitiesNo schedule
ActivityTypeFinish
Load a Current Schedule to select roadmap activities.
Selected roadmap0 selected
PDF: chronological
No roadmap activities selected yet.
Only Activity Codes actually assigned in the loaded XER are shown in the filter. The Roadmap timeline keeps the original visual style and fits up to 9 selected items per page. Driver evidence is summarized in an executive page; one-page-per-item detail remains optional. Roadmap selections never modify the source schedule.

Technical evidence workbook

Raw evidence, offenders and supporting datasets for audit and detailed review.

OverviewDCMA SummaryOffendersCritical PathDriversMetadata
Schedule Evidence PackProject schedule
—Activities
14Tests
—Fail / warning
—Drivers
TestStatusCount
Missing LogicPASS0
High FloatREVIEW—
Long DurationPASS—
Hard ConstraintsREVIEW—
Invalid DatesPASS0
DCMA status overview

Editable management deck

One message per slide. Text, tables, shapes and charts remain editable in PowerPoint.

01Executive Overview
02Schedule Quality
03Critical Paths
SEQNCS · SCHEDULE REPORT

Executive Overview

—Activities
—Completion Drivers
—Reliability
Management message
Schedule Quality 14 testsCritical Paths AvailableRoadmap Configured
Reporting configuration previewFREE users can inspect this workspace. Configuration changes and generation require PRO.

Lookahead PRO

Short-term execution planning from the shared Current Schedule.

No schedule loadedEsc to return

3-Week Lookahead

Build the Lookahead to create the execution window. No plan built
WBS
Activity Codes
Plan settings
Planning gridReview the execution population and click a row to plan it.
Activity IDActivityStatusContractorExecutorStartFinish
Load a Current Schedule to build the Lookahead.
No activities

Execution readiness

A concise view of the current execution population and planning status.

0Included
0Excluded / review
0Manual activities
0Blocked
Planning statusCurrent Included population
No plan built.
Execution breakdownTop disciplines
No plan built.

Explicit crew inputs only

Calculated only from crew values entered in the operational planning layer.

0Peak manpower
0Average / day
0Activities with crew
0%Crew coverage
Daily manpower profile—
Build the Lookahead and enter crew values to populate the daily profile.
Person-days by disciplineOperational input only
No manpower assigned.
Build the Lookahead before exporting.
PRO workspaceFREE users can inspect the live classification. Manual inclusion/exclusion and generation require PRO.